-     Home  |  Site Map  |  Site Tools  |  Contact Us
City of Atlanta Online Image of Atlanta



Northside Drive Corridor Study


STUDY DOCUMENT

PLEASE NOTE: For ease of downloading, the study report is posted in chapters, and without the full-page color figures.  The figures are downloadable on an as-needed basis, either individually or bundled by chapter (see next table).  Full-page figures can be easily inserted into the main document by replacing the blank placeholder pages that are identified by figure number and caption.

Chapter Last Updated

Size

Notes
Front Matter 8/3/05 246 KB Cover, Acknowlegements, Table of Contents, Lists of Figures and Tables
Chapter 1. Introduction 7/12/05

160 KB

6 pages. Study purpose, study area, etc.
Chapter 2. Issues and Opportunities 7/12/05 934 KB 69 pages. Existing conditions of the study area.
Chapter 3. Scenario Development 7/14/05

337 KB

8 pages. Process of modeling alternatives.
Chapter 4. Scenario Evaluation 7/18/05 222 KB 16 pages. How were different scenarios evaluated?
Chapter 5. Recommendations 7/18/05 1.0 MB 34 pages. Recommendations of the study.
Chapter 6. Implementation Plan 7/18/05 180 KB 10 pages. Implementing the recommendations.
Appendix A. Market Data 7/18/05 263 KB Results of the market analysys.
Appendix B. Demographic Projections 7/18/05 263 KB Forecasts of population and emplyment for the study area
Appendix C. Cost Estimating 7/18/05 106 KB How were costs for certain projects estimated in this study?
Appendix D. Preliminary Zoning Recommendations 7/5/05 0.6 MB Preliminary zoning maps and zoning district details.

 


STUDY DOCUMENT FULL-PAGE FIGURES & TABLES

Please Note: The following are the full-page figures or tables of the plan.  If a figure number or table number is absent from the list below, it is included in the main report.

Chapter 1 Figures Last Updated

Size

   1-1. Study Area 7/12/05

154 KB

   1-2. Study Area Analysis Zones 7/12/05

244 KB

   1-3. Study Process 7/12/05

222 KB

Chapter 2 Figures Last Updated

Size

Existing Land Use
  2-3. Zone 1 Deering Road
  2-4: Zone 2 10th Street
  2-5: Zone 3 North Avenue
  2-6: Zone 4 Vine City
  2-7: Zone 5 McDaniel Street

7/19/05


1 MB
1 MB
1 MB
1 MB
1 MB

Existing Zoning
  2-8. Zone 1 Deering Road
  2-9: Zone 2 10th Street
  2-10: Zone 3 North Avenue
  2-11: Zone 4 Vine City
  2-12: Zone 5 McDaniel Street

7/19/05


1 MB
1 MB
1 MB
1 MB
1 MB

Urban Design Assessment
  2-13. Zone 1 Deering Road
  2-14: Zone 2 10th Street
  2-15: Zone 3 North Avenue
  2-16: Zone 4 Vine City
  2-17: Zone 5 McDaniel Street

7/19/05


6.4 MB
6.6 MB
5.8 MB
5.0 MB
6.9 MB

Potential Redevelopment Opportunities
  2-18. Zone 1 Deering Road
  2-19: Zone 2 10th Street
  2-20: Zone 3 North Avenue
  2-21: Zone 4 Vine City
  2-22: Zone 5 McDaniel Street

7/19/05


7.8 MB
7.6 MB
8.5 MB
6.7 MB
8.7 MB

Current 15-Year Future Land Use
  2-23. Zone 1 Deering Road
  2-24: Zone 2 10th Street
  2-25: Zone 3 North Avenue
  2-26: Zone 4 Vine City
  2-27: Zone 5 McDaniel Street

7/19/05


1.2 MB
1.3 MB
1.3 MB
1.0 MB
1.2 MB

  2-28: LOS by Time of Day 7/19/05

11.3 MB

 

Chapter 3 Figures Last Updated

Size

Typical Sections
   3-1. Urban Boulevard
   3-2. Primary Thoroughfare


7/12/05
7/12/05


79 KB
418 KB

 

Chapter 4 Tables Last Updated

Size

  4-1: Evaluation Matrix - Methodology    7/19/05

28 KB

  4-2: Evaluation Matrix – Results 7/19/05

23 KB

  4-3: Comparison With City Development Policies

7/19/05

21 KB

 

Chapter 5 Figures Last Updated

Size

   5-1: Pedestrian Functionality 7/19/05

3.3 MB

   5-2: New Travel Lanes 7/19/05

3.7 MB

   5-5: BRT Facility on Northside Drive    7/19/05

15.6 MB

   5-6: Potential Activity Nodes Summary

7/19/05

2.2 MB

   5-9: Concept Plan – Marietta Street Node 7/19/05

9.3 MB

Framework Plan and
Recommended Future Land Use Changes
   5-7: Zone 1 Deering Rd.
   5-8: Zone 2 10th St.
   5-10: Zone 3 North Ave.
   5-11: Zone 4 Vine City
   5-12: Zone 5 McDaniel St.

7/19/05



1.9 MB
3.1 MB
3.3 MB
1.8 MB
2.9 MB

 

Chapter 6 Figures Last Updated Size

Implementation Plan
   6-1: Zone 1 Deering Rd.
   6-2: Zone 2 10th St.
   6-3: Zone 3 North Ave.
   6-4: Zone 4 Vine City
   6-5: Zone 5 McDaniel St.

7/20/05


3.3 MB
3.4 MB
3.5 MB
3.1 MB
4.0 MB

Chapter 6 Tables
  6-1: Implementation Plan 6/30/05

30 KB

  6-2: Short Term Work Program

6/30/05

300 KB

 

 

Appendix A Figures Last Updated Size
   A-1.  Market Analysis Area 7/19/05

265 KB

 

Appendix B -- No Full Page Figures or Tables

 

Appendix C Tables Last Updated Size
   C-1. Cost Estimating 7/19/05

372 KB

 

Appendix D Figures Last Updated Size Notes
   D-1. Preliminary Zoning Recommendations (North Corridor) 8/3/05

1.8 MB

I-75 to North Ave.
   D-2. Preliminary Zoning Recommendations (South Corridor) 8/3/05

1.8 MB

North Ave to I-20

 


OTHER RESOURCES

Resource Last Updated Size/Format Notes
Future Land Use Overview 7/12/05 1.8 MB/PDF 11" x 17" color brochure (2 pages)
June 30 Final Meeting Presentation 7/6/05

PDF

This is a pdf version of a large presentation with color photos & graphics (6 slides per page). For ease of download, it is given in four parts.
-- Part 1

1.1 MB

pages 1-5
-- Part 2 0.8 MB page 6
-- Part 3 0.6 MB page 7
-- Part 4 1.3 MB pages 8-10